Case 03 / Delivery

Greater Cairo Metro, Lines 3 and 4

Station delivery for Vinci Construction, including a station roof installed while rail services kept running underneath.

Role
Station Manager, running each station as project manager
Employer
Vinci Construction, Cairo
Period
Jun 2018 to Jan 2024
Stations
Imbaba, Maspero, Kit-Kat, Diverting
400+workers on station sites
40-60km² per station
0service interruptions at Imbaba
0safety incidents during the roof installation

On video

Still from a television report, on site at the metro station▶

Imbaba Station on Egyptian television

A video report filmed on site, where I walk through the project and the station. In Arabic.

Watch on YouTube ↗

The Imbaba roof

At Imbaba Station I executed the roof structure installation while Upper Egypt rail services continued operating.

The roof was installed with zero service interruption and zero safety incidents.

New station roof structure, installed above Rail service below Schematic, not to scale
Principle of the work. New structure above, live railway below.

What I managed

  • Ran each station as project manager: contractors, progress and execution of the works, with site teams of 400+ workers.
  • Subcontractors and contracts, including cost control through resource optimisation and productivity initiatives.
  • Schedule, budget and quality KPIs, tracked and reported through Aconex.
  • Weekly and monthly reporting to the client authorities.

Context

Line 3 Phase 3 of the Greater Cairo Metro is 18 km of double track with 15 stations. Its sections opened in stages: Attaba to Kit Kat in October 2022, Kit Kat to Rod El-Farag Axis in January 2024, and Kit Kat to Cairo University in May 2024.

Sources: NGE, Cairo Metro Line 3 Phase 3; Wikipedia, Cairo Metro Line 3. The role and figures above are my own.