Case 05 / Site operations
Facade protection in Germany and the Gulf
I ran operations and site work for Dab Flow Nanotechnology, which applies nano-material protection to building facades.
Facade work in GermanyWhat I did
- Ran facade protection and nano-material application programs on transportation and hospitality assets in Europe and the Gulf, including Noor Bank Metro Station in Dubai.
- Wrote the execution strategy for each program: planning, procurement, logistics, safety and quality control.
- Set up post-application performance monitoring so the result could be checked after the work was done.
Before and after
Dark blueGrey, weatheredSame facade, two conditions.
Dark blue panels
A deep, even finish across the panel.
Grey panels
A dull, uneven surface with visible marks. Office building in Germany.
On site


A finished facade
White panel facade, GermanyClean joints, even colour.
White panel facade with an even finish across panels and edges.
More Dab Flow work
Noor Bank Metro Station, Dubai
Sample treatments on aluminium cladding, glass, rubber joints and composite marble flooring.
Read the case →Rust removal at Ezz Steel, Alexandria
Sample patches on corroded steel structure at an operating steel plant.
Read the case →Facade photos are from programs in Germany. Client names are not shown on the Germany photos.